1. When used in control cable, which of the following must be grounded in order to be effective?

Question 1 of 20

2. To position cable so that it is not under tension, it is necessary to ________.

Question 2 of 20

3. How should terminal space be measured from the end of the lug or wire connector?

Question 3 of 20

4. Which of the following inscriptions on a wire connector indicates that it is designed for use on both copper and aluminum wire?

Question 4 of 20

5. Stripped wire should be inserted into the barrel of the crimper until ________.

Question 5 of 20

6. When installing mechanical connectors, which of the following is used to prevent the formation of surface oxides?

Question 6 of 20

7. The NEC® section that governs electrical connections and splices is ________.

Question 7 of 20

8. A good electrical connection should ________.

Question 8 of 20

9. Which of the following is true of drain wires in fire alarm and instrumentation cable?

Question 9 of 20

10. Wire connectors marked only with the wire size should only be used on ________.

Question 10 of 20

11. The best electrical tape to use as a protective overwrap on high-voltage cables is ________.

Question 11 of 20

12. Burnishes, nicks, and scrapes are generally the result of which of the following?

Question 12 of 20

13. To determine the correct connector size for MC cable, ________.

Question 13 of 20

14. How can you determine the wire size that can be used effectively with an insulated barrel crimp connector?

Question 14 of 20

15. When stripping conductors, be sure to ________.

Question 15 of 20

16. Before a splice or connection can be made to a Type THHN conductor, the ________.

Question 16 of 20

17. Heat-shrink insulators are intended to provide ________.

Question 17 of 20

18. A true statement concerning solid versus stranded conductors is ________.

Question 18 of 20

19. Which of the following eliminates the need for taping and the use of filler tape?

Question 19 of 20

20. To properly install heat-shrink insulators, ________.