TAP Services(865) 919-6674

26409-11 Heat Trace and Freeze Protection

1. As the temperature surrounding a self-regulating heating cable increases, the ________.

Question 1 of 25

2.

The component labeled 4 in the figure above is a(n) ________.

Question 2 of 25

3. Self-regulating cables are referred to as ________.

Question 3 of 25

4. The components used in domestic hot-water temperature maintenance systems are similar to those used in ________.

Question 4 of 25

5. A line-sensing control uses a mechanical thermostat or electrical controller to measure the ________.

Question 5 of 25

6. The component labeled 6 in the figure above is a(n) ________.

Question 6 of 25

7. According to NEC Article 424, radiant heating panels installed in concrete or poured masonry must not exceed ________.

Question 7 of 25

8. When installing heating cable, fasten the cable to the pipes using fiberglass tape or ________.

Question 8 of 25

9. How far below the finished surface should snow-melting and anti-icing systems be installed?

Question 9 of 25

10. Heating cable for snow-melting is typically installed in a serpentine pattern ________.

Question 10 of 25

11. The temperature at which a liquid first condenses when vapor is cooled is known as the ________.

Question 11 of 25

12. Which of the following describes continuity monitoring?

Question 12 of 25

13. The component labeled 2 in the figure above is a(n) ________.

Question 13 of 25

14.

The component labeled 4 in the figure above is a(n) ________.

Question 14 of 25

15.

The component labeled 1 in the figure above is a(n) ________.

Question 15 of 25

16. Heating cable should not be routed within how many inches of the edges of the pavement, drains, anchors, or other objects in the concrete?

Question 16 of 25

17. How are future service connections handled when installing heat tracing on domestic water supply systems?

Question 17 of 25

18. Which of the following is an NEC Article 427 requirement for the installation of electrical heat tracing cables on pipelines and vessels in unclassified areas?

Question 18 of 25

19. For outdoor electric de-icing installations, branch circuits and overcurrent devices supplying the equipment shall be sized at not less than what percentage of the total heater load?

Question 19 of 25

20. Electric heat tracing of pipelines is done for freeze protection and ________.

Question 20 of 25

21. In hospitals, schools, and prisons, electrical heat trace systems are used for ________.

Question 21 of 25

22. A mineral-insulated cable is a type of ________.

Question 22 of 25

23. On outdoor electric de-icing installations, prevent water from tracking into components by installing ________.

Question 23 of 25

24. On a roof de-icing system, secure cables to each other using ________.

Question 24 of 25

25.

The component labeled 7 in the figure above is a(n) ________.

Question 25 of 25