26401-11 Load Calculations 2

1. The interior lighting load for a school building with 175,000 square feet of floor space is ________.

Question 1 of 30

2. Refer to the figure above. What is the total load a feeder serving four 2hp motors, three 5hp motors, one 15hp motor, and one 25hp motor? All motors are 208V.

Question 2 of 30

3. Residential small appliance circuits must be rated at ________.

Question 3 of 30

4. Before it is considered a continuous load, a load must operate for at least how many hours without interruption?

Question 4 of 30

5. The allowable ampacity of a conductor run in a raceway with four to six conductors must be reduced by ________.

Question 5 of 30

6. Which part of a residential lighting and small appliance load must be rated at 35% for service calculations?

Question 6 of 30

7. If the number of current-carrying conductors in a conduit exceed three, the ampacity of the conductors must be adjusting using ________.

Question 7 of 30

8. The smallest size locking and grounding type receptacle that may be used to provide shore power for boats is ________.

Question 8 of 30

9. When calculating the service requirement for a particular building, the first step is to ________.

Question 9 of 30

10. When the overcurrent protection for a conductor is located on the load end rather than the supply side of a conductor it is considered to be a(n) ________.

Question 10 of 30

11.

Refer to the figure above. What is the total load of a feeder serving four 230V motors rated 5hp, 15hp, 20hp, and 40hp?

Question 11 of 30

12. The rules governing the design of circuits supplying power to boats is covered in ________.

Question 12 of 30

13. An optional method for determining feeder to schools is covered in ________.

Question 13 of 30

14. Feeder conductor size is adjusted when ________.

Question 14 of 30

15. What is the adjusted ampacity for each of six No. 4/0 THHN copper current-carrying conductors in a single conduit (given: the ampacity of 4/0 THHN is 260A)?

Question 15 of 30

16. The minimum ampacity for a feeder supplying ten 30A shore power receptacles in a marina is ________.

Question 16 of 30

17. What is the load center length for a tapped feeder with loads of 120A at 50', 110A at 60', 75A at 90', and 70A at 150'?

Question 17 of 30

18. What is the load for 40 non-dwelling unit receptacles (assume that the load is not continuous)?

Question 18 of 30

19. The minimum service rating for a residential service is ________.

Question 19 of 30

20. When performing load calculations for farm buildings, the load that must be included in the calculation at 100% demand must be at least ________.

Question 20 of 30

21. What is the feeder ampacity for a three -phase, 120/208V subpanel with a connected load of 84,563VA?

Question 21 of 30

22. A farm has three buildings with loads of 85.3A, 55A, and 30A. How many amps of this load will be subject to a 50% demand factor?

Question 22 of 30

23. Use of the 100' tap rule is limited to installation in high-bay manufacturing buildings with wall heights over ________.

Question 23 of 30

24. If a store lighting load is 14,000VA (continuous), which of the following must be used for the circuit calculation?

Question 24 of 30

25. A farm has three buildings with loads of 82A, 65A and 15A. What is the total load? Assume that there are no dwellings or motors.

Question 25 of 30

26. Which of the following lighting loads would be used in a residence that is 1,650 sq ft?

Question 26 of 30

27. If a continuous connected load totals 120A, what is the minimum current-carrying capacity required for the feeder?

Question 27 of 30

28. Using the VA/linear foot method, the total VA that must be used in a service calculation for a 50' show window is ________.

Question 28 of 30

29. Refer to the figure above. Calculate the minimum ampacity for a feeder serving the following 460V motors: 10hp, 20hp, and 30hp.

Question 29 of 30

30. What is the demand factor allowed by the NEC® for calculating the neutral conductor size for an electric range load?

Question 30 of 30