Module 03401 Exam Construction Drawings and Specifications

1. When reviewing the location of main electrical runs and fire sprinkler system lines on a floor plan in a set of drawings, you should look for _____.

 
 
 
 

2. Drawings that show a building’s location along with topographic details, such as contour lines and trees, are called _____.

 
 
 
 

3. Drawings that show the exterior style of a building are called _____.

 
 
 
 

4.  

How many 2″ sanitary system pipe clean-out fixtures are used in the sanitary/vent system shown in the figure?

 
 
 
 

5. Mechanical drawings for HVAC systems are typically shown in which type of view?

 
 
 
 

6. When producing a shop drawing, the first step is to _____.

 
 
 
 

7. A mechanical contractor’s normal sequence in which drawings are produced in house for a construction project is _____.

 
 
 
 

8. For each item listed on a schedule for mechanical equipment, the schedule typically shows both _____.

 
 
 
 

9. As an apprentice, if you find a discrepancy between the plan drawings and specifications for a job, you should _____.

 
 
 
 

10. The order in which the major divisions involved in a construction project are to perform their work is indicated in the _____.

 
 
 
 

11. Which aspects of contractual arrangements are covered in the Special and General Conditions portions of a specification?

 
 
 
 

12. Where does a subcontractor usually obtain the submittal information and shop drawings that are used to make up a submittal sheet?

 
 
 
 

13. HVAC contractors typically use takeoff sheets for air devices and equipment, piping and accessories, and _____.

 
 
 
 

14. Standard takeoff sheets are used to _____.

 
 
 
 

15. When doing a quantity takeoff, the last step is to _____.

 
 
 
 

Question 1 of 15